INSTALL AND  RIG GAS  PRODUCER CONTROL LINKAGE
INSTALL AND RIG GAS  PRODUCER  CONTROL LINKAGE (Continued) - TM-55-1520-240-23-3_639

TM-55-1520-240-23-3 CH-47D Heilcopter Manual
Page Navigation
  598    599    600    601    602  603  604    605    606    607    608  
TM  55-1520-240-23-3 4-113 INSTALL AND RIG GAS  PRODUCER CONTROL LINKAGE (Continued) 4-113 2. Measure  distance  between  centers of holes (3) in  rod  end  bearings  (4  and  5).  If length  is same as dimension  A  found  in  step  1,  go  to  step  3.  If not,  do  the  following: a. Remove  lockwire  and  loosen  nut  (6). b. Rotate  rod  end  bearing  (4)  until  distance between  centers  of  holes  (3) is  same  as dimension  A. c. Make  sure  rod  ends (4  and  5) are  aligned. d. Tighten  nut  (6). NOTE Nominal  distance  between  centers  of holes  in  rod  ends  is 13.16  to 13.28 inches. Do  not lockwire  nut at this  time. 3. Make  sure  No.1  ENG  COND lever (7) is at STOP. 4-400







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.