REMOVE  GAS PRODUCER CONTROL LINKAGE (Continued)
INSTALL AND RIG GAS  PRODUCER CONTROL LINKAGE (Continued) - TM-55-1520-240-23-3_638

TM-55-1520-240-23-3 CH-47D Heilcopter Manual
Page Navigation
  597    598    599    600    601  602  603    604    605    606    607  
TM  55-1520-240-23-3 4-113 INSTALL AND  RIG GAS  PRODUCER CONTROL LINKAGE 4-113 INITIAL  SETUP Applicable Configurations: Without    74 Tools: Powerplant   Repairer’s  Tool  Kit,   NSN 5180-00-323-4944 Torque  Wrench,  30  to  150  Inch-Pounds Materials: Lockwire  (E230) Parts: Cotter Pins Personnel  Required: Aircraft  Powerplant  Repairer (2) Inspector References: TM  55-1520-240-23P Equipment  Condition: DC  Power  On  (Task  1-37) NOTE Procedure  is same  to  install  and  rig gas producer system  control  linkage on  No.  1  or No.  2  engine.  Installation and  rigging  on  No.  1  engine  is  shown here. Check that  control  link 114P2035-19 is used.  Otherwise,  the  fault  indicator light  on  the  master  caution  panel may  give  a  false  indication  during operation. 1. Measure  dimension  A  between  actuator shaft  (1) and  fuel  control  shaft (2). 4-399







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.