TM 55-1520-240-23-3
4-114
REMOVE GAS PRODUCER CONTROL LINKAGE ROD
4-114
INITIAL SETUP
Applicable Configurations:
Without 74
Tools:
Powerplant Repairers Tool Kit, NSN
5180-00-323-4944
Materials:
None
Personnel Required:
Aircraft Powerplant Repairer
Equipment Condition:
Battery Disconnected (Task 1-39)
Electrical Power Off
Engine Work Platform Open (Task 2-2)
Engine Access Cover Open (Task 4-49)
NOTE
Procedure is same to remove gas
producer control linkage rod from No.
1 or No. 2 engine. Removal of No. 1
rod is shown here.
1.
Remove cotter pin (1), nut (2), and washer (3)
from lever (4).
2.
Remove cotter pin (5), nut (6), and washer (7)
from lever (8).
3.
Remove rod (9).
4-405