TM 55-1520-240-23-3
4-113
INSTALL AND RIG GAS PRODUCER CONTROL LINKAGE
(Continued)
4-113
15.
Position rod (24) on bolt (17). Install washer
(25) and nut (26). Torque nut to 30 to 60
inch-pounds. Install cotter pin (27).
INSPECT
16.
Position lever (28) behind rod (24). Install bolt
(29), two washers (30), and nut (31). Torque nut
to 30 to 60 inch-pounds. Install cotter pin (32).
NOTE
Control linkage is omitted for clarity.
17.
Align index mark (33) on fuel control pointer (34)
with center of G1 band (35).
4-403