• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL AND RIG GAS  PRODUCER  CONTROL LINKAGE (Continued) - TM-55-1520-240-23-3_641
REMOVE  GAS  PRODUCER  CONTROL  LINKAGE  ROD

TM-55-1520-240-23-3 CH-47D Heilcopter Manual
Page Navigation
  602    603    604    605    606  607  608    609    610    611    612  
TM  55-1520-240-23-3 4-113 INSTALL AND RIG GAS  PRODUCER CONTROL LINKAGE (Continued) 4-113 18. Slide  lever  (28)  on  shaft  (2).  Install  bolt  (36),  two washers  (37),  nut  (38),  and  cotter  pin  (39). 19. Make  sure  index  mark  (33)  on  pointer  (34)  is centered  on  GI  band  (35).   If  it  is  not,  do  the following: a. Loosen  nut  (6). b. Rotate  cylinder  (40)  until index  mark  (33)  on pointer  (34)  is  centered  on  GI  band  (35). c. Tighten  nut  (6). 20. Lockwire  nut  (6). INSPECT FOLLOW-ON  MAINTENANCE: Perform  operational  check  of  gas  producer  system (TM  55-1520-240-T). Close  engine  access  cover  (Task  4-50). Close  engine  work  platform  (Task  2-2). DC  power  off  (Task  1-37). END  OF  TASK 4-404







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.