• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL  ACTUATOR  SUPPORT BRACKET
REMOVE  GAS PRODUCER CONTROL LINKAGE (Continued)

TM-55-1520-240-23-3 CH-47D Heilcopter Manual
Page Navigation
  595    596    597    598    599  600  601    602    603    604    605  
TM  55-1520-240-23-3 4-112 REMOVE  GAS  PRODUCER  CONTROL  LINKAGE 4-112 INITIAL  SETUP Applicable Configurations: Without    74 Tools: Powerplant   Repairer’s  Tool  Kit,   NSN 5180-00-323-4944 Materials: Twine  (E433) Personnel  Required: Aircraft  Powerplant  Repairer Equipment  Condition: Battery Disconnected  (Task  1-39) Electrical  Power Off Engine  Work  Platform  Open  (Task  2-2) Engine  Access  Cover Open  (Task 4-49) NOTE Procedure  is  same  to  remove  gas producer  linkage  from  No.  1  or  No.  2 engine.  No.  1  engine  is shown  here. 1. Remove  cotter  pin  (1),  nut (2),  and  washer  (3) from  lever  (4). 2. Remove  cotter  pin  (5),  nut (6),  and  washer  (7) from  lever  (8). 3. Remove  rod  (9). 4-397







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.