• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REMOVE  GAS PRODUCER CONTROL LINKAGE  ROD (Continued)
REPAIR  GAS  PRODUCER  CONTROL LINKAGE  ROD

TM-55-1520-240-23-3 CH-47D Heilcopter Manual
Page Navigation
  605    606    607    608    609  610  611    612    613    614    615  
TM  55-1520-240-23-3 4-115 INSPECT  GAS PRODUCER  CONTROL LINKAGE  ROD 4-115 INITIAL  SETUP Applicable Configurations: Without    74 Tools: Dial  Indicator Dial  Indicating  Scale,  0  to  50  Pounds Vise Materials: None Personnel  Required: Inspector Equipment  Condition: Off  Helicopter  Task 1. Apply 5  to 15  pound  load  to  bearing  (1) in  radial direction. 2. Apply  5  to  15  pound  load  to  bearing  (1) in opposite  direction. 3. Measure  radial  play  of  bearing  (1).  Radial  play shall  not be  more  than  0.005 inch. 4. Repeat  steps  1  thru  3  three  times.   Rotate bearing  (1) to  a  different  position  each  time. 5. Repeat steps  1  thru  4  on  bearing  (2). 6. Apply  5 to 15  pound  load  to  bearing  (1) in  an axial  direction. 7. Apply  5  to  15  pound  load  to  bearing  (1) in opposite  direction. 8. Measure  axial  play of  bearing  (1).  Axial  play shall not  be  more  than  0.025  inch. 9. Repeat steps  6  thru  8  to  bearing  (2). FOLLOW-ON MAINTENANCE: None END  OF  TASK 4-407







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.