TM 55-1520-240-23-7
8-101
INSTALL HYDRAULIC MAINTENANCE PANEL COMPONENTS
(Continued)
8-101
INSPECT
NOTE
Procedures to install five terminal
board mounting tracks are similar.
Installation of TB1 is shown here.
2.
Installation of TB1 mounting track is as follows:
a.
Remove tag and position mounting track (5).
For TB1, numbers 1 through 10 must read
left to right. For TB2 through TB5, numbers 1
through 10 must read bottom to top.
b.
Install two screws (6) and washers (7).
3.
Install wire harness as follows:
a.
Install all five clamps (8) on wire harness (9).
b.
Position wire harness (9) in panel (2).
c.
Install five screws (10) and washers (11).
d.
Install wire harness receptacles (12) in panel
(2).
e.
Install two nuts (13) on receptacles (12).
Lockwire nuts together. Use lockwire (E231).
8-321