• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL GAS PRODUCER CONTROL LINKAGE ROD
ADJUST ENGINE  DROOP  ELIMINATOR  VARIABLE  RESISTORS

TM-55-1520-240-23-3 CH-47D Heilcopter Manual
Page Navigation
  608    609    610    611    612  613  614    615    616    617    618  
TM 55-1520-240-23-3 4-117 INSTALL GAS PRODUCER CONTROL LINKAGE ROD     (Continued) 4-117 NOTE To determine if washers are reqiured at the two locations, the bearing width is to be measured.  If the bearing width measures  0.437 inch, a washer is required under both head and nut, an additional washer may be required under the nut for stack-up purposes. If the bearing width measures  0.593 inch, no washer is required under the head.  However, a washer may be required under the nut for stack-up purposes. 2. Position rod (5) on bolt (6).  Make sure end with nut (4) on rod is forward.  Install washer (7) and nut (8). Torque nut to 30-60 inch-pounds. Install cotter pin (9). INSPECT 3. Position rod (5) on bolt (10).  Install washer (11) and nut (12).  Torque nut to  30-60 inch-pounds. Install cotter pin (13). 4. Lockwire nut (4).  Use lockwire (E229). INSPECT FOLLOW-ON MAINTENANCE: Perform operational check of gas producer system (TM 55-1520-240-T). Close engine access cover (Task 4-50). Close engine work platform (Task 2-2). END OF TASK 4-410 Change 1







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.