TM 55-1520-240-23-9
11-77
ASSEMBLE PILOTS COCKPIT CONTROL ASSEMBLY
(Continued)
11-77
ASSEMBLE PITCH AND ROLL INPUT SOCKET
68.
Press bearing (dissimilar metals) (121) in socket
(122) until it bottoms. Use arbor press.
69.
Install spacer (123) in socket (122). Press
bearing (dissimilar metals) (124) in socket until it
bottoms. Use arbor press.
70.
Install bushing (dissimilar metals) (125) flange
inward, in left lug of socket (122).
71.
Install bushing (dissimilar metals) (126) in right
lug of socket (122).
INSPECT
INSTALL PITCH AND ROLL INPUT SOCKET
FLIGHT SAFETY PARTS
This is an installation critical flight
safety part. All aspects of its assembly
and installation must be ensured at
each joint connection and mounting to
the airframe.
Ensure that all bushings are properly
installed (including orientation) in the
output clevis of the bellcrank.
Ensure bellcrank hub bearings are
serviceable and properly installed.
Ensure proper attaching hardware
(impedance type bolt, nut, and
washers) is installed including
verification of bolt head orientation,
torque, and installation of cotter pins.
Loose attachments within flight control
primary linkage will degrade aircraft
control. Missing components will
cause loss of control.
72.
Position socket (122) in bellcrank (105), tube
(127) up and forward.
73.
Install bolt (128) head left, two washers (129 and
130), and nut (131).
74.
Torque nut (131) to 85 to 192 inch-pounds.
Install cotter pin (132).
11-368
