TM 55-1520-240-23-6
7-320
FLUSH HOIST CONTROL RETURN TUBING
(Continued)
7-320
FOLLOW-ON MAINTENANCE:
Install control valve (Task 7-250).
Install pressure reducer (Task 7-259).
Perform operational check of hoist control (TM
55-1530-240-T).
Install heater compartment acoustic blanket (Task
2-210).
END OF TASK
7-1152