TM 55-1520-240-23-6
7-321
FLUSH GROUND TEST, PUMP, HAND PUMP, AND RESERVOIR PRESSURE
TUBING
(Continued)
7-321
22.
Disconnect tube (37) from PRESS port (38) of
hand pump (39).
23.
Connect hose (40) length about 8 feet to port
(38) of pump (39). Route hose up through pylon
to reservoir cooler (41) on right of pylon.
24.
Working right of pylon, disconnect tube (42) from
PRESS port (43) of reservoir (41).
25.
Connect hose (40) to port (43) of reservoir (41).
26.
Disconnect tee fitting (44) from accumulator (45).
27.
Install plug (46) in fitting (44).
7-1157