• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL  TUNNEL AFT  CONNECTING LINKS (Continued)
INSTALL TUNNEL AFT CONNECTING LINKS (Continued) - TM-55-1520-240-23-9_948

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  915    916    917    918    919  920  921    922    923    924    925  
TM  55-1520-240-23-9 11-239 INSTALL TUNNEL AFT CONNECTING LINKS (Continued) 11-239 NOTE Procedure  is same  for left  and  right connecting  links except as noted  in task.  Right  side  at  sta.  401  is  shown here. 4. Position  link (1)  and  tunnel  connecting  link  (8) in  control  arm  (9). 5. Install  bolt  (10), two  washers  (11  and  12),  and nut  (13).   Torque  nut  to  60 to  90 inch-pounds. Install  cotter  pin  (14). 6. Check  bolt (10).  Bolt  shall  not rotate  with  torque less  than  10 inch-pounds.   Bolt  shall  have  no axial  looseness.  If  bolt rotates  or  is  loose,  add washer under nut and  repeat step  5. 11-931







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.