• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL  TUNNEL CONNECTING LINKS (Continued) - TM-55-1520-240-23-9_942
REMOVE  TUNNEL AFT  CONNECTING LINKS (Continued)

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  911    912    913    914    915  916  917    918    919    920    921  
TM  55-1520-240-23-9 11-238 REMOVE  TUNNEL AFT CONNECTING  LINKS 11-238 INITIAL  SETUP Applicable Configurations: All Tools: Aircraft  Mechanic’s Tool  Kit, NSN 5180-00-323-4692 Materials: Paper  Tags  (E264) Personnel  Required: Medium  Helicopter Repairer (2) References: TM  1-1520-253-23 Equipment  Condition: Battery Disconnected  (Task  1-39) Electrical  Power Off Hydraulic  Power Off No.   5  and  No.   6  Tunnel  Access  Doors  Open  (Task 2-2) Safety  Blocks  (T31)  Installed  (Task  11-28) Servocylinder Connecting  Links  Disconnected  (Task 11-192) NOTE Procedure  is  same  to  remove  left or  right  connecting  links.   Right connecting  links at sta.  401  and  444.5 are  shown  here. NOTE If  a  crack  in  the  connecting  link  is suspected  during  removal,  refer to  TM 1-1520-253-23. 1. At  sta.  401,  tag  connecting  link  (1). 2. Remove  cotter  pin  (2), nut (3), washers  (4),  and bolt  (5)  from  forward  end  of tunnel  aft connecting link (1),  aft  end  of tunnel  connecting  link  (6), and control  arm  (7). 3. Remove  forward  and  of connecting  link (1)  from tunnel connecting  link (6)  and  control arm  (7). 11-927







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.