TM 55-1520-240-23-9
11-19
REMOVE DAMAGED RIG PIN FROM FIRST STAGE CONTROLS
(Continued)
11-19
7.
Remove section of pin (1) from fittings (6 and 7).
8.
Inspect first stage controls for damage (Task
11-18).
9.
Install bellcranks (2, 3, 4, and 5) (Task 11-189).
10.
Rig first stage controls (Task 11-51).
FOLLOW-ON MAINTENANCE:
Connect forward and aft servocylinder connecting
links (Task 11-193).
Remove servocylinder safety blocks (Task 11-29).
Perform neutral rig check (Task 11-33).
Perform operational check of flight controls (TM
55-1520-240-T).
Close forward left work platform (Task 2-2).
Install forward transmission drip pan (Task 2-3).
END OF TASK
11-78