TM 55-1520-240-23-9
11-222
REMOVE AFT LCT CONNECTING LINK
11-222
INITIAL SETUP
Applicable Configurations:
All
Tools:
Aircraft Mechanics Tool Kit, NSN 5180-00-323-4692
Materials:
Paper Tags (E264)
Personnel Required:
Medium Helicopter Repairer (2)
References:
TM 1-1520-253-23
Equipment Condition:
Battery Disconnected (Task 1-39)
Hydraulic Power Off
Electrical Power Off
Aft Pylon Work Platforms Open (Task 2-2)
Aft Rotor Pitch Links Disconnected (Task 5-97)
Safety Blocks (T31) Installed (Task 11-28)
NOTE
Positive retention bolts are installed
in upper controls. Bolts have a pawl
which prevents nut or bolt removal
unless pawl is depressed (Task 1-13).
Attaching bolts, washers and nuts will
be temporarily installed after removing
connecting link and actuator.
NOTE
If a crack in the connecting link or
yoke is suspected during removal,
refer to TM 1-1520-253-23.
1.
Remove cotter pin (1), nut (2), washers (3), and
tilt (4) attaching LCT actuator (5) to yoke (6).
2.
Support yoke (6) with wood block (7).
11-868
