TM 55-1520-240-23-9
11-189
INSTALL FIRST STAGE MIXING ASSEMBLY
(Continued)
11-189
INSTALL ROLL AND YAW CONNECTING LINK
40.
Remove nut (54), two washers (55 and 56), and
bolt (57) from bellcrank (8).
41.
Position roll and yaw link (58) in bellcrank (8).
42.
Install bolt (57), two washers (56 and 55), and
nut (54). Do not torque nut at this time.
43.
Remove nut (59), two washers (60 and 61) and
bolt (62) from bellcrank (18).
44.
Position link (58) in bellcrank (18).
45.
Install bolt (62), two washers (61 and 60), and
nut (59). Do not torque nut at this time.
46.
Neutral rig first and second stages and check
control stop adjustments (Task 11-51).
CONNECT PITCH, THRUST, ROLL AND YAW
INTERCONNECTING LINKS
47.
Remove nut (63), two washers (64 and 65) and
bolt (66) from bellcrank (7).
48.
Position pitch link (67) in bellcrank (7).
49.
Install bolt (66), two washers (65 and 64), and
nut (63). Do not torque nut at this time.
50.
Remove nut (68), two washers (69 and 70), and
bolt (71) from bellcrank (2).
51.
Position thrust link (72) in bellcrank (2).
52.
Install bolt (71), two washers (70 and 69), and
nut (68). Do not torque at this time.
11-760