TM 55-1520-240-23-9
11-88
INSTALL COCKPIT CONTROL TRANSFER BELLCRANKS
(Continued)
11-88
CONNECT PITCH CONNECTING LINKS AND DASH
ACTUATOR
42.
Remove nut (80), two washers (81 and 82), and
bolt (83) from lower arm (10) bellcrank (8).
43.
Untie pitch transfer connecting link (84). Position
link in lower arm (10) of bellcrank (8). Install bolt
(83), two washers (82 and 81), and nut (80). Do
not torque nut at this time.
44.
Remove nut (85), two washers (86 and 87), and
bolt (88) from aft arm (9) of bellcrank (8).
45.
Untie pitch idler connecting link (89). Position
link in aft arm (9) of bellcrank (8). Install bolt (88),
two washers (87 and 86), and nut (85). Do not
torque nut at this time.
46.
Remove nut (90) two washers (91 and 92), and
bolt (93) from aft upper arm (94) of bellcrank (8).
47.
Untie DASH actuator (95). Position actuator (95)
in aft upper arm (9) of bellcrank (8). Install bolt
(93), two washers (91 and 92), bushing (92.1),
and nut (90). Do not torque nut at this time.
48.
Remove tags from links (84 and 89), actuator
(95), and bellcrank (8).
49.
Neutral rig cockpit transfer bellcranks (Task
11-46).
50.
Perform neutral rig check of cockpit flight controls
(Task 11-33).
INSPECT
11-476
