TM 55-1520-240-23-9
11-84
INSTALL STICK PITCH POSITION INDICATOR
(Continued)
11-84
24.
Clean sealant from flange (56) and inside surface
(57) of access. Use acetone (E20) and cloths
(E120). Wear gloves (E186) and goggles.
Wires must not support housing;
otherwise, damage to equipment
could occur.
25.
Support housing (58). Remove strap (59).
26.
Apply sealant (E336) to both sides of gasket (60).
Install gasket on flange (56). Remove excess
sealant with acetone (E20) and cloths (E120).
Use goggles for eyes.
27.
Tilt housing assembly (58) and position up and
inside access (37), lamp (61) aft. Align housing
and access holes (62).
28.
Position housing (63) over access (37). Install 32
washers (64) and screws (65).
INSPECT
FOLLOW-ON MAINTENANCE:
Install AFCS panel (Task 11-273).
Install ADF RCVR panel (TM 11-1520-240-20).
Perform operational check of landing light (TM
55-1520-240-T).
END OF TASK
11-446