TM 55-1520-240-23-9
11-56
RIG TUNNEL CONTROLS LINKAGE
(Continued)
11-56
NOTE
Procedure is same to rig all tunnel
controls linkage. Linkages are located
at sta. 163, 201, 241, 281, 321, 361,
and 401. Linkage at sta. 401 is shown
here.
1.
Working in passageway install first stage rig pin
(T44) (1) through fitting (2), four bellcranks (3, 4,
5, and 6) and in fitting (7). Pin must slide freely.
If not, rig first stage bellcranks (Task 11-51), then
repeat step 1.
2.
Remove pin (1) from fitting (2).
3.
Working from forward left work platform, install
second stage rig pin (T135) (8) through support
(9) and four bellcranks (10, 11, 12, and 13)
and fitting (14). Pin must slide freely. If not,
rig second stage bellcranks (Task 11-51), then
repeat step 3.
INSPECT
11-256