TM 55-1520-240-23-911-56RIG TUNNEL CONTROLS LINKAGE(Continued)11-56NOTEProcedure is same to rig all tunnelcontrols linkage. Linkages are locatedat sta. 163, 201, 241, 281, 321, 361,and 401. Linkage at sta. 401 is shownhere.1.Working in passageway install first stage rig pin(T44) (1) through fitting (2), four bellcranks (3, 4,5, and 6) and in fitting (7). Pin must slide freely.If not, rig first stage bellcranks (Task 11-51), thenrepeat step 1.2.Remove pin (1) from fitting (2).3.Working from forward left work platform, installsecond stage rig pin (T135) (8) through support(9) and four bellcranks (10, 11, 12, and 13)and fitting (14). Pin must slide freely. If not,rig second stage bellcranks (Task 11-51), thenrepeat step 3.INSPECT11-256
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business