TM 55-1520-240-23-9
11-56
RIG TUNNEL CONTROLS LINKAGE
(Continued)
11-56
12.
Working from forward left work platform, remove
pin (8) from support (9).
FOLLOW-ON MAINTENANCE:
Remove servocylinder safety blocks (T31) (Task
11-29).
Close forward left work platform (Task 2-2).
Close tunnel access doors (Task 2-2).
Install forward transmission drip pan (Task 2-3).
Install closet acoustic blanket (Task 2-108).
Remove electrical power.
Remove hydraulic power.
END OF TASK
11-258