TM 55-1520-240-23-9
11-51
RIG FIRST AND SECOND STAGE BELLCRANKS
(Continued)
11-51
9.
Loosen nut (29) on link (25). Turn rod end (30)
until link can be positioned in bellcrank (23) with
bolt (22) installed loosely.
10.
Torque nut (29) of link (25) to 95 to 100
inch-pounds.
11.
Install bolt (22), two washers (21 and 20), and
nut (19) in bellcrank (23). Do not torque nut at
this time.
12.
Repeat steps 9, 10, and 11 for link (26) and
bellcrank (24).
RIG SECOND STAGE BELLCRANKS
13.
Working from forward left work platform, install
second stage rig pin (T135) (31) through support
(32), four bellcranks (33, 34, 35, and 36), and
hole (37) in structure. Pin must slide freely. If free
remove pin then go to Follow-On Maintenance. If
not, perform steps 14 thru 29.