TM 55-1520-240-23-6
7-134
INSTALL AFT SWIVELING SERVOCYLINDER
(Continued)
7-134
Antiseize compound (E75) can irritate
skin and cause burns. Avoid contact
with skin, eyes, or clothing. In case
of contact, immediately flush skin or
eyes for at least 15 minutes. Get
medical attention for eyes.
20.
Tilt swashplate (42) and position bearing (43)
between two lugs (29). Install bolt (44), washer
(45), and nut (46). Coat shank of bolt and outside
diameter of bushing with antiseize compound
(E75). Do not get compound on thread of bolt.
Wear gloves (E184.1).
21.
Torque nut (46) to 660 to 780 inch-pounds
(1400 inch-pounds maximum for cotter pin
installation). Install cotter pin (47).
21.1.
Inspect installation (Task 7-123).
22.
Connect hose (48) to elbow (12). Remove tag.
23.
Connect hose (49) to elbow (14). Remove tag.
24.
Connect hose (50) to tee (6). Remove tag.
25.
Connect hose (51) to tee (9). Remove tag.
INSPECT
FOLLOW-ON MAINTENANCE:
Connect aft pitch links (Task 5-99).
Bleed flight control hydraulic system (Task 7-16).
Perform neutral rigging test (Task 11-33).
Close right aft work platform (Task 2-2).
END OF TASK
7-605/(7-606 blank)