TM 55-1520-240-23-6
7-40
INSTALL NO. 1 OR NO. 2 POWER CONTROL MODULE HIGH PRESSURE RELIEF
VALVE
(Continued)
7-40
7.
Install bowl (13) in port (14). Tighten hand tight.
8.
Install two screws (15) in switch (16).
9.
Connect connector (17) to switch (16).
10.
Lockwire bowl (13) to module (18). Use lockwire
(E231).
INSPECT
FOLLOW-ON MAINTENANCE:
Perform operational check (TM 55-1520-240-T).
Close left forward work platforms or right pylon
access door (Task 2-2).
END OF TASK
7-203