TM 55-1520-240-23-6
7-40.2
INSTALL NO. 1 OR NO. 2 POWER CONTROL MODULE HIGH PRESSURE CHECK
VALVE
(Continued)
7-40.2
1.
Install two retainers (1), and packing (2), on
valve (3).
2.
Install two back-up rings (4), and packing (5),
on valve (3).
3.
Install valve (3) in module (6).
4.
Lockwire valve (3). Use lockwire (E231).
7-208