TM 55-1520-240-23-3
4-75
INSTALL ENGINE AIR INLET FAIRING
(Continued)
4-75
9.
Connect hose (30) to port (31) on transmission
(10). Remove tag.
10.
Connect hose (32) to port (33). Remove tag.
11.
Connect hose (34) to port (35). Remove tag.
12.
Connect cable plug (36).
13.
Position clamp (37) with temperature and chip
detector wiring (38) against clip (39) on lower
lifting lug (40). Install screw (41) and nut (42).
FOLLOW-ON MAINTENANCE:
Install engine drive shaft (Task 6-32).
Install engine transmission fairing (Task 4-73).
Install engine air inlet screens (Task 4-76).
Perform operational check of gas producer control
system (TM 55-1520-240-T).
Perform operational check of power turbine control
system (TM 55-1520-240-T).
Close engine side and cover access covers (Task
4-50).
Close engine work platform (Task 2-2).
Perform initial run-up (Task 4-4).
Check powerplant plumbing for leaks.
Check forward engine mounts for proper clearance
after four hours of flight.
Perform operational check of engine oil low level
warning system (TM 55-1520-240-T).
Retorque exhaust cone coupling nuts after initial
ground run.
END OF TASK
4-324