TM 55-1520-240-23-3
4-75.1
INSTALL ENGINE AIR INLET FAIRING
(Continued)
4-75.1
20.
Connect hose (37) to port (38) on transmission
(39). Remove tag.
21.
Connect hose (40) to port (41). Remove tag.
22.
Connect hose (42) to port (43). Remove tag.
23.
Connect cable plug (44).
24.
Position clamp (45) with temperature and chip
detector wiring (46) against clip (47) on lower
lifting lug (48). Install screw (49) and nut (50).
FOLLOW-ON MAINTENANCE:
Install engine drive shaft (Task 6-32).
Install engine transmission fairing (Task 4-73).
Install engine air inlet screens (Task 4-76).
Close engine access covers (Task 4-50).
Close engine work platform (Task 2-2).
Perform initial run-up (Task 4-2).
Check powerplant plumbing for leaks.
Check forward engine mounts for proper clearance
after four hours of flight.
Perform operational check of engine oil low level
warning system (TM 55-1520-240-T).
END OF TASK
4-329