TM 55-1520-240-23-3
4-10.1
REMOVE POWERPLANT
(Continued)
4-10.1
8.
Tag (E264) and disconnect three hoses (17) at
transmission (18). Drain oil into container. Wipe
up any spilled oil. Use cloths (E135). Wear
gloves (E184.1).
9.
Loosen strain relief (19) and disconnect cable
plug (20) from temp switch (21).
10.
Disconnect plug at remote connector (22) from
chip detector.
11.
Install sling (23) as follows:
a.
Open access door (24) in engine access
cover (25).
b.
Connect two cables (26) to forward fittings
(27) on powerplant (1).
c.
Connect cable (28) into aft fitting (29) through
cover (25).
d.
Adjust sling (23) until eye (30) is over center
hole (31) in sling bar (32).
e.
Install pin (33) through sling bar (32).
12.
Connect hoist (34) to eye (30) of sling (23).
Absorb weight of powerplant (1) with hoist.
13.
Remove nut (35), two washers (36), bolt (37),
and bushing (38) from aft engine mount (39).
4-55