TM 55-1520-240-23-3
4-140
INSTALL AND RIG POWER TURBINE CONTROL LINKAGE
(Continued)
4-140
5.
Check that TRIM & TIMER circuit breaker (12)
on No. 1 power distribution panel (13) is closed.
Check that No. 1 EMERG ENG TRIM circuit
breaker (14) and TRIM circuit breaker (15) are
closed.
4-456