TM 55-1520-240-23-9
11-234
REMOVE TUNNEL FORWARD CONNECTING LINKS
(Continued)
11-234
4.
Remove nut (7), two washers (8), bolt (9), and
electrical lead ground wire (10) from clamp (11).
5.
Remove cotter pin (12), nut (13), washers (14),
and bolt (15) from connecting links (1 and 16)
and control arm (17).
6.
Without 38 , if connecting link (1) is to be
replaced remove clamp (11) from link.
7.
With 38 , if connecting link (1) is to be replaced,
leave clamp (11) with link.
8.
Remove connecting links (1 and 16) from control
arm (17).
FOLLOW-ON MAINTENANCE:
None
END OF TASK
11-913