TM 55-1520-240-23-9
11-225
INSTALL AFT LCT CONNECTING LINK
(Continued)
11-225
8.
Have helper raise yoke (5). Guide end fitting
bearing (22) on link (11) into lug (23) of yoke.
Guide end fitting bearing (6) of LCT actuator (24)
into lug (25) of yoke.
9.
Install recessed washer (3) on bolt (4), recess
toward head. Install bolt dry, head forward
through yoke lug (25) and actuator bearing (6).
Install washer (2) and nut (1).
10.
Torque nut (1) to 660 to 780 inch-pounds . Do
not exceed 1400 inch-pounds for cotter pin
alignment. Install cotter pin (26).
INSPECT
11.
Install recessed washer (19) on bolt (21), recess
toward head. Install bolt dry, head aft, through
yoke lug (23) and link bearing (22). If bolt can be
installed, install washer (20) and nut (18) and
go to step 12. If bolt cannot be installed, go to
step 13.
12.
Torque nut (18) to 660 to 780 inch-pounds.
Do not exceed 1400 inch-pounds for cotter pin
alignment. Install cotter pin (27). Go to step 20.
11-878