TM 55-1520-240-23-9
11-210
INSTALL FORWARD LCT CONNECTING LINK
(Continued)
11-210
8.
Route connecting link cable (22) over yoke (13).
Attach cable to five mounting plates (23) on yoke.
Use cable straps (E375).
9.
Install three cable clamps (24) on cable (22).
Install clamps on near bulkhead (25).
10.
Connect link connector (26) to cruise guide
signal conditioner (27).
INSPECT
FOLLOW-ON MAINTENANCE:
Rig forward swashplate and servocylinder (Task
11-54).
Connect pitch links (Task 5-99).
Perform operational check of cruise guide system
(TM 55-1520-240-T).
Perform neutral rig check (Task 11-33).
Close aft pylon work platforms (Task 2-2).
END OF TASK
11-835