TM 55-1520-240-23-9
11-188
REMOVE FIRST STAGE MIXING ASSEMBLY
(Continued)
11-188
NOTE
Attaching bolt, washers, and nut will
be temporarily installed after removing
links and bellcranks. Amount of
washers may vary.
NOTE
If a crack in the connecting links,
bellcranks, or supports is suspected
during removal, refer to TM
1-1520-253-23.
TO REMOVE PITCH AND THRUST CONNECTING
LINK
1.
Tag pitch and thrust connecting link (1). Remove
cotter pin (2), nut (3), washers (4), and bolt (5)
from bellcrank (6).
2.
Remove cotter pin (7), nut (8), washers (9), and
bolt (10) from bellcrank (11).
3.
Remove link (1).
4.
Install two bolts (5 and 10), washers (4 and 9),
and two nuts (3 and 8) in bellcranks (6 and 11).
TO REMOVE ROLL AND YAW CONNECTING LINK
5.
Tag roll and yaw connecting link (12). Remove
cotter pin (13), nut (14), washers (15), and bolt
(16) from bellcrank (17).
6.
Remove cotter pin (18), nut (19), washers (20),
and bolt (21) from bellcrank (22).
7.
Remove link (12).
8.
Install two bolts (16 and 21), washers (15 and
20), and two nuts (14 and 19) in bellcranks (17
and 22).
TO DISCONNECT PITCH. THRUST, ROLL AND YAW
INTERCONNECTING LINKS
9.
Remove cotter pin (23), nut (24), washers (25),
and bolt (26). Disconnect pitch link (27) from
bellcrank (6). Install bolt, washers, and nut in
bellcrank.
10.
Remove cotter pin (28), nut (29), washers (30),
and bolt (31). Disconnect thrust link (32) from
bellcrank (33). Install bolt, washers, and nut in
bellcrank.
11-748
