INSTALL MIXING LINKAGE CONNECTING LINKS
(Continued)
11-187
57.
Check bolts (7, 14, 21, 27, 34, 40, 48, 55, 60,
66, 71, 76, 80, 85, 89, 94, 98, 104, 108, and
114). Bolts shall not be rotated with a torque less
than 10 inch-pounds. Bolts shall not have axial
looseness. If bolt rotates or is loose, add washer
under nut and repeat step 53, 54, 55, or 56.
INSPECT
FOLLOW-ON MAINTENANCE:
Connect forward and aft connecting links to
servocylinders (Task 11-193).
Connect pitch, roll, yaw and thrust at intermediate
bellcranks (Task 11-185).
Perform neutral rig check (Task 11-33).
Perform controls clearance check (Task 11-5).
Close forward left work platform (Task 2-2).
END OF TASK