TM 55-1520-240-23-9
11-178.1
REPAIR YAW, THRUST, ROLL, OR PITCH ILCA INTERMEDIATE CONNECTING LINKS
(AVIM)
(Continued)
11-178.1
NOTE
Work quickly with chilled bushings.
Bushings must be installed before
they warm.
19.
Remove bushings (2) from dry ice and wipe
clean and dry. Use cloth (E120). Wear goggles.
Wear Kevlar gloves (E187).
NOTE
The bores of link (1) have a shoulder
on the outside. Install bushings (2) by
pressing outboard.
20.
While epoxy primer (E292) is wet, press
bushings (2) into bores (5) until fully seated (TM
55-1500-322-24). Use an arbor press.
21.
Wipe off excess primer from bushings (2). Use
cloth (E120) and wear gloves (E184.1). Allow
bearings to warm to room temperature.
INSPECT
22.
Roller or impression stake sleeve (4) to
lug (6) and bearing (3) on both sides. Use
roller swage sleeve staking method or
circumferential line impression staking method
(TM 55-1500-322-24). Use roller kit (T169)
where applicable.
INSPECT
23.
Touch up reworked areas of link (1). Use epoxy
primer (E292.1). Wear gloves (E184.1).
FOLLOW-ON MAINTENANCE:
None
END OF TASK
11-713