TM 55-1520-240-23-9
11-31
REMOVE ROTARY-WING BLADE LEAD/LAG TOOL
(Continued)
11-31
7.
Have helper turn aft rotor head (14) until blade
(15) is over right work platform.
8.
Repeat step 2.
9.
Working from right work platform, have helper
move blade (15) until tool (8) on absorber (16)
is loose.
10.
Support tool (8). Remove two pins (17) from tool
and remove lower clamp (11). Lift and remove
tool from absorber (16).
11.
Release wrench (6).
12.
Repeat steps 7 thru 11 for aft blades (18 and 19).
FOLLOW-ON MAINTENANCE:
Close tunnel access door (Task 2-2).
Close forward and aft work platforms (Task 2-2).
Remove rotary-wing blade tiedowns (Task 1-26).
END OF TASK
11-102