TM 55-1520-240-23-7
8-39
REMOVE CRUISE GUIDE SIGNAL CONDITIONER
8-39
INITIAL SETUP
Applicable Configurations:
All
Tools:
Electrical Repairers Tool Kit, NSN 5180-00-323-4915
Materials:
Paper Tags (E264)
Personnel Required:
Aircraft Electrician
Equipment Condition:
Battery Disconnected (Task 1-39)
Electrical Power Off
Hydraulic Power Off
Right Forward Work Platform Open (Task 2-2)
1.
Tag and disconnect two connectors (1 and 2)
from signal conditioner (3).
2.
Remove four screws (4) and washers (5).
3.
Remove signal conditioner (3).
FOLLOW-ON MAINTENANCE:
None
END OF TASK
8-125