TM 55-1520-240-23-6
7-215
ASSEMBLE UTILITY RESERVOIR/COOLER (AVIM)
(Continued)
7-215
14.
Install two packings (22), supply tube (23), pin
(24), and cotter pin (25) in manifold (26).
15.
Install elbow (27), and nut (28) in manifold (26).
16.
Install manifold (26), three screws (29), and three
washers (38) on reservoir (4). Torque screws to
30 inch-pounds.
17.
Lockwire screws (29). Use lockwire (E231).
18.
Install tube (31) between reservoir (4) and
manifold (26).
19.
Install two packings (32) on each transfer tube
(33).
20.
Install two transfer tubes (33) in cover (34).
21.
Position one joint (35) between cover (34) and
supply tube (23). Install three screws (36).
22.
Position other joint (35) between cover (34) and
cooler return tube (10). Install three screws (36).
23.
Torque six screws (36) to 20 inch-pounds.
Lockwire screws (36). Use lockwire (E231).
FOLLOW-ON MAINTENANCE:
Test utility reservoir/cooler (Task 7-217).
END OF TASK
7-818