TM 55-1520-240-23-6
7-149
INSTALL APU START ACCUMULATOR
(Continued)
7-149
2.
Position accumulator (4) on pin at base of
mount (5). Pivot accumulator into position being
careful to engage transfer tubes into accumulator
without damaging seals. Install two bolts (6) and
washers (7).
3.
Check that there is a gap of 0.06 to 0.25 inch
between mount and accumulator.
4.
Torque bolts to 250 inch-pounds.
5.
Install line (8) between accumulator (4) and
fitting (9).
INSPECT
FOLLOW-ON MAINTENANCE:
Service accumulator air charge (Task 1-65).
Bleed utility hydraulic reservoir/cooler, APU
pump/motor and utility pump system (Task 7-336).
Perform operational check (TM 55-1520-240-T).
Close right aft transmission access door (Task 2-2).
Close cargo ramp (TM 55-1520-240-T).
END OF TASK
7-665