TM 55-1520-240-23-6
7-110
INSTALL NO. 1 OR NO. 2 FLIGHT CONTROL RESERVOIR/COOLER TEMPERATURE
BULB
(Continued)
7-110
NOTE
Procedure is same to install No. 1 or
No. 2 flight control reservoir/cooler
temperature bulb.
1.
Install bulb (1) and packing (2) in port (3).
2.
Connect electrical connector (4) to bulb (1).
3.
Lockwire bulb (1), switch (5), and valve (6). Use
lockwire (E231).
INSPECT
FOLLOW-ON MAINTENANCE:
Service reservoir/cooler (Task 1-60, 1-61, or 1-62).
Bleed flight control hydraulic system (Task 7-16).
Perform operational check of flight control system
(TM 55-1520-240-T).
Close right forward access panel (Task 2-2).
Close right forward work platform or left pylon access
panel (Task 2-2).
END OF TASK
7-511