TM 55-1520-240-23-6
7-108
INSTALL FLIGHT CONTROL RESERVOIR/ COOLER RELIEF VALVE
(Continued)
7-108
NOTE
Procedure is same to install No. 1 or
No. 2 flight control reservoir/cooler
relief valve.
1.
Install valve (1), retainer (2), packing (3), retainer
(4), and packing (5) in port (6).
2.
Lockwire valve (1), switch (7) and bulb (8). Use
lockwire (E231).
INSPECT
FOLLOW-ON MAINTENANCE:
Service reservoir/cooler (Task 1-60, 1-61, or 1-62).
Bleed flight control hydraulic system (Task 7-16).
Perform operational check of flight control system
(TM 55-1520-240-T).
Close right forward work platform or left pylon access
panel (Task 2-2).
END OF TASK
7-507