Home
Download PDF
Order CD-ROM
Order in Print
INSTALL RIGHT ENGINE TRANSMISSION OIL COOLER (Continued)
VIBRATION CORRECTION PROCEDURE (AVIATION VIBRATION ANALYZER) (Continued) - TM-55-1520-240-23-5_731
TM-55-1520-240-23-5 CH-47D Heilcopter Manual
Page Navigation
694
695
696
697
698
699
700
701
702
703
704
TM 55-1520-240-23-5
6-217
VIBRATION CORRECTION PROCEDURE (AVIATION VIBRATION ANALYZER)
6-217
INITIAL SETUP
Applicable Configurations:
All
Tools:
Aircraft Mechanics Tool Kit, NSN
5180-00-323-4692
Torque
Wrench, 30-150 Inch-Pounds
Torque
Wrench, 150-750 Inch-Pounds
Materials:
Marking Pencil (E270.1)
Oil (E254)
Grease (E190)
Dry Cleaning Solvent (E162)
Cloth, Cleaning (E120)
Gloves (E184.1)
Goggles (E473)
Personnel Required:
CH-47 Helicopter Repairer
Inspector
Rotary Wing Aviators (2)
References:
Task 1-89
Tasks 6-2 thru 6-6
Tasks 6-8 thru 6-10
Tasks 6-12 thru 6-19
Task 6-30
Task 6-30.2
Task 6-30.3
Task 6-32
Task 6-182
Task 6-186
TM 1-6625-724-13&P
TM 1-1520-240-10
Equipment Condition:
Battery Disconnected (Task 1-39)
Electrical Power Off
Hydraulic Power Off
Pylon Hinged Fairing Open (Task 2-2)
Pylon Lower Fairing Open (Task 2-2)
Engine Drive Shaft Access Covers Removed (Task
2-2)
Engine Air Inlet Screens Removed (Task 4-65)
Engine Transmission Fairing Access Covers Open
(Task 2-2)
NOTE
For vibration analysis setup
procedures with the AVA go to
TM 1-6625-724-13&P.
6-708
Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business