TM 55-1520-240-23-5
6-92
REMOVE AFT TRANSMISSION
(Continued)
6-92
5.
Install two clamps (9) around rotor shaft (7).
Secure them to each other with pins (10) through
plates (11).
6.
With aid of helper, loosely secure clamps (9)
to shaft (7) by tightening two knobs (12). Slide
clamp assemblies down shaft to align with
uprights (13) on two adapter bars (5). Install pins
(14) through uprights and plates (11).
7.
Tighten clamps (9) around shaft (7) with two
knobs (12).
INSTALL HOIST KIT
8.
Open aft pylon left and right work platforms (15)
(Task 2-2).
NOTE
Yoke must be disconnected for
forward hoist and beam assembly
clearance.
9.
Remove cotter pins (16), nuts (17), washers (18),
and bolts (19) from lower end of actuator (20)
and link (21). Disconnect actuator and link from
yoke (22). Remove actuator from swashplate
yoke (23).
10.
Tie yoke (22) to swashplate yoke (23). Use twine
(E433).
6-343