TM  55-1520-240-23-5
6-80
ASSEMBLE  AFT TRANSMISSION  SUMP
(Continued)
6-80
1.
Coat  packing  (1)  and  thread  of  temperature
probe  (2) with  oil  (E254) Install  packing  on  probe.
Install  temperature  probe  in  sump  (3).   Torque
probe  to  75  inch-pounds.
2.
Lockwire  probe  (2)  to  sump  (3).   Use  lockwire
(E231).
3.
If  cap  (4)  and  housing  (5)  are  joined, push  cap
into  housing, twist,  and  pull.  Remove  cap  from
housing.
NOTE
If cap  and  housing  are  new,  cleaning
is  not  needed.
4.
Clean  cap  (4) and  housing  (5).  Use  dry cleaning
solvent (E162) and  cloths (E120).   Wear gloves
(E186).
5.
Install  packing  (6) on  housing  (5).  Install  housing
in  sump  (3).  Install  three  bolts (7) and  washers
(8).  Torque  bolts  to  60 inch-pounds.
6.
Lockwire  three  bolts (7) together.  Use  lockwire
(E231).
7.
Press center of cap  (4) in.  Install cap  and  packing
(9) in  housing  (5).  Push  in  cap  until  center snaps
out  flush  with  outside  of  housing.
8.
Coat packing  (10) and  thread  of drain  valve  (11)
with  oil  (E254).   Install  packing  on  valve.   Install
drain  valve  in  sump  (3).   Torque  valve  to  75
inch-pounds.
9.
Lockwire  drain  valve  (11)  to  sump  (3).   Use
lockwire  (E231).
6-307