TM 55-1520-240-23-5
6-74
PREPARE COMBINING TRANSMISSION FOR SHIPMENT OR STORAGE
(Continued)
6-74
9.
Install transmission (4) in shipping container
(T36) (12) as follows:
a.
Inspect and prepare container (T36) (12) (TB
55-8100-200-25).
b.
Connect sling (T34) (13) to two lifting lugs
(14). Connect work hoist hook (15) to sling.
c.
With aid of helper, lift transmission (4) into
container (T36) (12). Align with four mounting
brackets (16).
d.
Remove sling (T34) (13).
e.
Secure transmission (4) to container
mounting brackets (16) with four bolts (17),
washers (18), and nuts (19). Torque nuts to
55 foot-pounds.
f.
Prepare required maintenance forms and
reports (DA PAM 738-751 and TB 750-126).
g.
Put two 16-unit bags of desiccant (E160) into
containers (T36) (12).
INSPECT
h.
Install cover (20) on container (T36) (12).
Install bolts (21), washers (22), split washer
(23), and nut (24) at 24 places.
i.
Torque nuts (24) at 3, 6, 9, and 12 oclock
to 275 inch-pounds. Torque nuts at 2, 4, 8,
and 12 oclock to 275 inch-pounds. Torque
remaining nuts to 275 inch-pounds.
INSPECT
6-286
