TM 55-1520-240-23-5
6-51
INSTALL FORWARD TRANSMISSION PACKAGE
(Continued)
6-51
9.2.
Torque right bolt (17) as follows:
a.
Install socket assembly (14.1) on right bolt
(17).
b.
Install torque applicator (15) over square
drive of socket assembly (14.1) with large
hole forward of assembly. Observe THIS
SIDE UP stamping on applicator.
c.
Install forward end of applicator (15) in center
block (15.3) of reactor (16). Install socket at
end of reactor on forward bolt (18).
d.
Install pin (16.2) through center block (15.3)
and applicator (15).
e.
Check that ratchet selector (16.3) on torque
pack (T23) (16.4) is set to NUT ON.
f.
Install torque pack (T23) (16.4) on square
drive of socket assembly (14.1). Rotate pack
so that two pins (16.5) on bottom fit into holes
(16.6) in applicator (15). Use tee handle
(T161) (16.7).
Be sure handle is fully seated and
ratchet selector on torque pack is
properly set before applying torque.
Moving selector with load on torque
pack can damage unit and injure
personnel.
NOTE
Input force must be maintained at
handle to obtain accurate torque
reading on torque pack indicator.
g.
Set tee handle (T161) (16.7) to ON. Turn
handle clockwise until indicator (16.8) reads
885 foot-pounds.
h.
Set tee handle (T161) (16.7) to OFF. Turn
handle counterclockwise until indicator (16.8)
reads 0. Check that torque pack (T23) (16.4)
is loose on bolt (17).
i.
Remove torque pack (16.4) and torque
reactor assembly (T159).
6-196
