TM 55-1520-240-23-5
6-51
INSTALL FORWARD TRANSMISSION PACKAGE
(Continued)
6-51
21.
Connect electrical connector (49) to signal
conditioner (50).
CONNECT LOWER POINTS
22.
Install gasket (50.1) and pump (51) over studs
(52) and nuts (54).
23.
Torque nuts (54) to 85 inch-pounds.
NOTE
Torque on nuts (54) must be checked
for 85 inch-pounds after the first
flight. Do not back off nuts before
torquing.
24.
Connect oil temperature connector (55).
25.
Connect hoses (56 and 57) to left servocylinder
(32).
26.
Connect chip detector connector (58).
27.
Connect hoses (59 and 60) to right servocylinder
(26).
INSPECT
6-200