TM 55-1520-240-23-3
3-30
DISASSEMBLE AFT LANDING GEAR
(Continued)
3-30
11.
Loosen nut (25) and remove elbow (26), packing
(27), and retainer (28).
12.
Remove nut (25) from elbow (26).
NOTE
Static ground wire is installed on left
gear only.
13.
Remove static ground wire (29) if working on left
gear (Task 3-37).
FOLLOW-ON MAINTENANCE:
None
END OF TASK
3-77