TM 55-1520-240-23-3
3-31
ASSEMBLE AFT LANDING GEAR
(Continued)
3-31
12.
Install packing (22) and union (23) in swivel
housing (19).
13.
Install nut (24), retainer (25), and packing (26) on
tee (27). Install tee in actuator (16).
14.
Install swivel housing pressure tube (28) on
union (23) and tee (27).
15.
Install static ground wire (29) on left gear (Task
3-38).
16.
Install power steering assembly (30) on right
gear (Task 7-300).
FOLLOW-ON MAINTENANCE:
None
END OF TASK
3-80