TM 55-1520-240-23-3
4-112
REMOVE GAS PRODUCER CONTROL LINKAGE
4-112
INITIAL SETUP
Applicable Configurations:
Without 74
Tools:
Powerplant Repairers Tool Kit, NSN
5180-00-323-4944
Materials:
Twine (E433)
Personnel Required:
Aircraft Powerplant Repairer
Equipment Condition:
Battery Disconnected (Task 1-39)
Electrical Power Off
Engine Work Platform Open (Task 2-2)
Engine Access Cover Open (Task 4-49)
NOTE
Procedure is same to remove gas
producer linkage from No. 1 or No. 2
engine. No. 1 engine is shown here.
1.
Remove cotter pin (1), nut (2), and washer (3)
from lever (4).
2.
Remove cotter pin (5), nut (6), and washer (7)
from lever (8).
3.
Remove rod (9).
4-397